Select Language

Some of APNCO Projects

A) Water and Wastewater Department

Research Projects

  • Consulting for 15&16 phases of Assalouyeh to select the best water treatment technology, ordered by Sepanir Co.,
  • Feasibility study to supply potable and service water for Imam Ali (PBUH) holy shrine in Najaf (Iraq) with total capacity of 174000 m3/d,
  • Feasibility study and reliminary design for wastewater treatment system of Imam Ali (PBUH) holy shrine in Najaf (Iraq) with total capacity of 57000 m3/d,
  • Feasibility study of thermal and membrane technologies hybrid for with total capacity of 3200 m3/d for Mapna Co.,
  • Feasibility study of thermal and membrane technologies hybrid for with total capacity of 8000 m3/d for Sepanir Co.,
  • Feasibility study of thermal and membrane technologies hybrid for with total capacity of 4400 m3/d for Petro Pars Co.,
  • Feasibility study of MED recovery increase via nanofiltration system as pretreatment.

B) Energy Department

  • CHP plant with capacity of 1 MW in Fanniroo Co. factory in Parand industrial city, Tehran,
  • Feasibility study of CHP plant with capacity of 2 MW for Pegah factory, Mashhad,
  • Feasibility study of CHP plant with capacity of 0.4 MW for ministry of health, Tehran,
  • Feasibility study of CHP plant with capacity of 2 MW for Pegah factory, Shiraz,
  • Feasibility study of CHP plant with capacity of 16 MW for holy shrine Imam Ali (A),
  • Feasibility study of CHP plant with capacity of 2 MW for Pasteur Institute of Iran,
  • Feasibility study of CHP plant with capacity of 2 MW for Samed Chemical Industry Co., Mashhad,
  • Feasibility study of CHP plant with capacity of 10 MW for Iran Khodro Diesel Factory, Tehran.
© 2010 Avin Palayesh Niroo Co. - Designed by A&M Bonakdar